CONNECTING STATIONS

2024–ONGOING

Design Activism · Speculative Gamification · AI-Mediated Heritage

Role & Context

Core Team Member & Experience Designer

Cross-Cultural Design Collective

RiverViews conceptual space

Overview

Connecting Stations is a design activist collective operating in the Middle East and beyond. We create immersive, gamified experiences that train participants to bypass political gridlock and "prototype" shared futures. Using a blend of physical game mechanics and digital tools, we construct temporary autonomous zones where diverse groups can practice radical empathy.

Case Study: RiverViews (Rondine, Italy)

For the YouTopic Festival, we developed RiverViews, an immersive simulation game for youth from conflict zones (e.g., Armenia/Azerbaijan, Russia/Ukraine). The core mechanic centered on a "Riverboard", a physical interface merging participants' home rivers into a shared territory.

RiverViews interface screenshot
Workshop participants at RiverViews
RiverViews workshop session
RiverViews project plan

My Contribution: The AI Hybridization Engine

I developed the project's digital backbone: a Custom AI Agent that functioned as a "Cultural Blender."

The Process: Participants inputted symbolic objects from their rival cultures. The AI Output: The system generated Hybrid Artifacts and Speculative Rituals—new cultural forms that belong to neither side alone, but to a future "River Community". The Result: The AI didn't just summarize conversation; it visualized a tangible, shared heritage, allowing participants to see the potential of their coexistence.

Rondine outdoor maps installationRondine outdoor maps installationRondine outdoor maps installationRondine outdoor maps installationRondine outdoor maps installationRondine outdoor maps installationRondine outdoor maps installationRondine outdoor maps installation

← Scroll horizontally to explore →

Core Team

Michal Pauzner & Oded Kutok: Co-Founders

Sawsan Masarwa: Design Researcher & Project Manager

Olga Stadnuk: Experience Design & Creative Technology

Rim Abdelkader: Architect

Adi Weintraub: Visual Communication

Ginosar Wolf Hansel: Architect (RiverViews Collaboration)